From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Bob
Dalton
bobedalton@yahoo.com
606-494-2107
SPECIAL
TRAINING/CERTIFICATIONS: Basic Telecommunications Course
“Methods of Procedures” O.S.H.A.; Owensboro, KY (1993) Guidelines for Work Place Safety
O.S.H.A; Owensboro, KY (1993) Fujitsu Standards and
Installations Class for Transmission Equipment, B.N.C. Coaxial connection and
installation course; Washington, D.C. (1996) Bell Atlantic “Standards,
Procedures, and Safety; Baltimore, MD (1998) MCI WorldCom Coaxial Connection
and Installation Course; Boston, MA (1998) TAD Telecom “Basic Instructional
Course for New Light wave Installers”; Newport, RI (1999) MCI WorldCom “DC Power Standards
and Procedures”; Wilmington, DE (1999) MCI WorldCom “Light wave Fiber
Splicing Course”; Hartford, CT (2000) MCI WorldCom “BNC Connector
Course” Cleveland, OH (2000) MCI WorldCom “DC Power Standards
and Procedures: Phase II”; Cleveland, OH (2001) True Position LMU Install
training for single band 850; Washington, DC (2002) T-Mobile LMU Installation and
Maintenance 850; New Orleans, LA (2005) True Position LMU Installation,
Maintenance, Troubleshooting, Harvesting WLS, and KDI; San Francisco, CA
(2006) Clear Wire Install and
provisioning training for Wireless Broadband Network; Dayton,
Ohio (2007) TMO MR-FLX-002-FLXINS_CI-USA Flexi Multi Radio BTS (2G &
3G) Commissioning & Integration Certification; Atlanta,
GA (2012) TMO MR-BTS-001-FLXLTE-USA/TMO MR
700-BTS-003-FLXLTE-USA TMO RA LTE-RRU BOOT
CAMP Chicago, Ill (2014) CONTRACTOR
EMPLOYMENT HISTORY Pinnacle Location:
Columbus, Ohio 07/14
– 01/15 NSN/T-Mobile CST/BTS Engineer · Supervise
construction/Build of NSN Flexi BTS on “Chairs” · Site Walks
Pre and Post (Punch) · Update
software, Commission, and Integrate NSN Flexi 2-G/LTE Equipment · Troubleshoot;
Packet Abis, T-1, LMU, VSWR, GPS, FIQB, Radios, Swapped Sectors.... · Closeouts Frontier
Locations:
Huntington, WV
07/13
– 10/13 Central Office Field Supervisor · Completion
of final interview process for possible candidates to be deployed in the
field in the WV market · Place and
supervise techs according to skill set in the areas they were needed · Create
spreadsheets and maps with site info · Follow up
with techs to resolve any unanswered questions or issues · Keep techs
up to date with what’s conspiring within the
market. 07/10
– 1/11 NOC Technician/Central Office
Tech
· Utilizing
Software such as, REACT, Varinet / V-Repair, MetaSolve (M-6), to make trouble
tickets for circuits for AT&T, Sprint, Alltel, Nextel, T-Mobile, Coal
Mines, Commercial Companies, and GPS Remotely · Track
Field Techs with GPS software, Loop CSU, Test Circuits for Major Companies · Test
remotely with in-state and out of state Techs to resolve site issues and
escalate trouble tickets as needed to insure issues are resolved as quickly
and efficiently as possible. AT&T
Locations:
MA, NY, IN, IL, MO 04/13
– 05/13 Sr. Integration
Engineer
· Complete
site surveys/walks with AT&T CM · Document
access info and equipment on site for MCPA Harvest to reconfigure Ericsson
3106 and 3206 BTS with Nokia GSM and bypass MCPA for AT&T 4G LTE upgrade
and · Instruct
new hires on the same. 01/08
– 03/08 Sr. Auditor/Supervisor
· NY/Indianapolis
Restoration Project E-911 LMU Troubleshooting · Post
install site audits, troubleshooting for E-911 LMU · Decom
"harvest" WLS, KDI, Program Kentrox Flexmaster · Surveys,
Beacon issues, Spect. issues, Holdovers, Gains , along with other maintenance
that goes along with LMU installs or HOT CUTS · Maintenance
on “DAC” sites (Down After Commissioning) RF issues, Radio Issues, GPS Ant.
Failure, LMU failure, connectors, etc. for Ericsson, and Nortel BTS. 08/07
– 09/07 Tester/Trainer
· Instruct
installers to Install OTR’s in OM5200 and OME6500, CPL shelves, Run Fibers
etc. 03/05
– 09/05 Installation Technician Level
IV · Worked
primarily with Siemens HCBSC & HCTRAU · Complete
install running cable to DSX terminate run & terminate power base &
extension racks in cell sites T-Mobile
Locations:
WI, IL, GA, MO, LA, DC 02/13
– 03/13 Lead Integrator / Construction Manager · Build,
troubleshoot, integrate and commission for NSN/T-Mobile Multi Radio BTS
2G/GSM, 3G/UMTS to make way for 4G/LTE and D-Com of Nortel S8000 and S12000 · Maintain
CM duties, pictures, closeout packages, site walks, materials, crew, etc. · Integration
of sites · Instruct
new CM’s how closeout info needed to be populated, pictures that are needed
and order in which they need to be taken due to safety issues, along with
info needed on each pic, the correct way to collect data needed for 911
survey to validate and assure the LMU stayed operational. · Worked
hand in hand with T-Mobile’s Tiger Team to learn how to properly troubleshoot
issues with corrupt software, Fibers, Cards, LMU, Bad Ports, etc. · Scope fiber
and capture file, test fiber with fiber test set and calibrate tester. · PIM,
Anritsu, RET’s · Insure
tower crews had proper documentation and followed all safety rules and
precautions 11/12
– 01/13 Commissioner/Integrator
· NSN
Certification of completion for I/C (Integration-Commissioning) Course for
NSN/T-Mobile Multi Radio BTS 2G/3G, in Atlanta, GA. · Ground-up
installs of NSN 2-G, 3-G, Radio, Modules, FOCA, and COVP to replace existing
Ericsson 2106-2206 BTS, relocate T-1, run fiber from modules in FOCA to COVP
on the ground, to the COVP on the tower, install and terminate alarm panel. · Install
circuit breaker, power, etc. in Purcell cabinet, preform test calls on 2G for
911 and 3G for voice and data, take closeout pictures, troubleshoot fiber
jumpers, assist tower crew with ground work and issues at the COVP “up top”
and Integrate/Commission sites to prep for 4-G-LTE equipment to be installed
in the future · Assure
Tower Crew knew what was needed from them “up top” as well as on the ground,
and made sure all safety precautions were being followed 06/08 – 06/09 Field
Tech
· UMTS T-1
integration with Node-B, from Nortel S12000 BTS for 3-G upgrade for the NODE
B. “Build” S12000 Nortel BTS in various configurations 2-2-2, 3-3-3, 6-5-3,
8-6-6, 4-3-3, etc. · Train New
Hires on same. · Troubleshoot
T-1/CSU issues, Head to head with switch on T-Berd; install cold weather kits
(Ceats Kits). · Cabinet
compressions going from up to 3 S12000’s BTS cabinets, down to as few as 1 · Supervise
Tower Crews for TMA Installs. · TMA
installs with PDU to increase DC output along with troubleshooting issues
with TMA not being seen by PDU or by the Anritsu, issues with “extra radios”
in a sector not being connected correctly, Sector adds for a forth sector,
New Site builds, decommission s12000 Nortel “Live and ON LINE” and replace
with s8000 and re-commission the site with the Switch or NOC and troubleshoot
any issues that come along with this process such as TEI positions not loaded
correctly, bad radios, etc. · LMU
install, troubleshoot, maintenance, drive test, T1 issues with the switch
& commission the equipment 09/05 – 11/05 Field
Technician
· LMU
install, troubleshoot, maintenance & commission of Ericsson 2106-2206 BTS
cabinets in Baton Rouge & New Orleans post Hurricane Katrina · Install
& commission True Position LMU · Perform
site surveys for T-Mobile Ericsson 2106-2206 · Test T-1
& powerlines using T-Berd and Watt meters · Measure
and wire sites based on technical specs · Test and
troubleshoot all equipment with remote switch tech Smart
Source Location:
KY 11/12
POS
Installer
· Install
all POS equipment for fast food restaurants · Assisting
in the integration and commissioning of new equipment; Registers, monitors,
computers, run CAT-5, make connectors, terminate, etc. ConnectLink
Location:
OH 04/08
– 05/08 Tower Crew
Foreman
· Wireless
Internet; Tower Crew Foreman · Instruct
tower hands on safety, · Installation
of radio equipment and antennas on towers, “Ping” nearby towers, climb up to
650' and install wireless RF antennas, switch, and components for service to
the customer from the provider. · Custom
equipment modification and fabrication to meet customers’ needs and adhere to
OSHA standards. Clear
Wire
Location:
OH 05/07
– 06/07 Lead Field
Engineer · Mount
Program, Power-up and up-grade Adtran, Foundry, Valere, Omnitronix SL81, BTS,
Tasman, Digi Modem along with programming and commissioning of Redline,
Orthogon, and Dragon Wave Microwave Installation and set-up. Cingular
Location:
CA 08/06
– 12/06 Sr.
Auditor
· Pre
install site audits on Nortel and Ericsson BTS, Post install site audits,
troubleshooting for E-911 LMU, · Decom
“harvest” WLS, KDI, and Program Kentrox and Flex master from Ericsson, Nortel
BTS Surveys, Beacon issues, Spectral Issues, Holdovers, Gains, along with
other maintenance that goes along with LMU installs or HOT
CUTS.
· Coordinate
installation efforts of other installation teams at various locations
concurrently
04/06
– 08/06 Lead
Technician
· Implemented,
programmed and commissioned True Position (E-911 LMU) Wireless Location Unit
into GSM Ericsson 2102 and 2106 BTS cabinets and Nokia BTS 850/1900
Ultra-Sites deployed at Cingular Wireless/AT&T/T-Mobile Wireless Run RF,
Sweep with Anritsu, Troubleshoot, Loopback test, Surveys, Collected GPS
latitude and longitude data from handheld for site survey. · Made RF,
coax, RJ45, N-Type connectors and T1 (CAT 5) line plus experience with
microwave systems and Andrews connectors EDUCATION SHAWNEE
STATE UNIVERSITY 2 years |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|